Capstone Home Improvement / Pella, Iowa

Concrete driveways, patios and slabs in Pella

Capstone Home Improvement pours concrete driveways, patios, sidewalks, garage pads and shop floors in Pella, Iowa. The same crew does the dirt work and hauls the base rock, so the prep and the pour are done right together.

Updated September 2026

Freshly poured concrete driveway in front of a house, with an orange cone at the curb

What we do

Concrete driveways, patios and slabs

  • Driveways, approaches and aprons
  • Patios and backyard slabs
  • Sidewalks, including along the street
  • Garage pads and shop floors
  • Concrete steps
  • Concrete walls
New concrete garage pad poured beside a house, forms still in place
Garage pad
Finished concrete patio slab behind a white house
Backyard patio
New concrete patio and step off a screened porch
Patio off a screened porch
Curved concrete sidewalk running through landscape rock beside a red house
Curved walk through landscape rock
Replaced concrete sidewalk along a residential street
Sidewalk replacement along the street
Smooth new concrete floor inside a shop building
Shop floor

How a job goes

  1. 1

    Call or text Clayton.

    Send a few photos of the spot.

  2. 2

    We look at the site.

    We talk through the plan and give you an estimate. [CONFIRM WITH OWNER: free estimates?]

  3. 3

    We do the work.

    We prep, haul, form and pour, then clean up.

FAQ

Questions about concrete in Pella

What concrete work does Capstone do?

Driveways, patios, sidewalks, garage pads and shop floors, aprons, steps and concrete walls.

Do you do the base prep too?

Yes. Capstone does the dirt work and hauls the base rock before the pour, so the prep and the pour are done by the same crew.

Do you pour concrete driveways in Pella?

Yes. Capstone pours driveways, driveway approaches, garage pads and aprons in Pella and nearby towns. Call or text 641-204-2065 with a photo of the spot for an estimate.

How long before I can drive on a new concrete driveway?

As a general rule, stay off new concrete with a car for about a week and keep heavy trucks off for about a month while it cures. Clayton will give you the timeline for your pour.

Updated September 2026

Got a slab, a driveway or a pile of dirt that needs moving?

Call or text Clayton

641-204-2065

Text a photo of the spot or send the form.